The current number of signaling paths to all Base Stations.
There is one signaling path created between the ASN-GW and
each base station, so the current number of signaling paths
is equal to the number of base stations currently connected
to the ASN-GW. Signaling paths and base stations are used
interchangeably throughout this document.