nbsEusmCableTestStatus 1.3.6.1.4.1.629.202.3.2.1.1

To initiate and get the status of the cable test feature. It is applicable only to copper ports. In the future we may have multiple copper ports. A GET on this object will show testIdle if a test has never been run, or testCompleted(4) if it has. When testStart(2) is SET, for a short time of about 3 seconds you would expect to see testInProgress(3). Time-stamp of the test start will be sent by the SNMP agent to the line-card to keep track of the time instance of the test.

Informations

Access Type
readwrite notSupported(1), testStart(2), testInProgress(3), testCompleted(4), testIdle(5)

Parent

1.3.6.1.4.1.629.202.3.2.1 nbsEusmCableTestEntry