The minimum required phase balance at source 1.
When the percentage difference between the minimum and maximum
phase voltage measurements at source 1 is greater than this value,
source quality is considered bad and the generator run signal
is asserted to begin generator operation.
Specified as a percentage. A value of zero indicates that phase balance
is ignored when determining source quality. -1 if not available.