The highest acceptable voltage condition at source 1.
When any phase of source 1 is greater than this voltage,
source quality is considered bad and the generator run signal
is asserted to begin generator operation.
Specified in volts, line-to-line for a 3-wire service or
line-to-neutral for a 4-wire service.
-1 if not available.